Client: Daejan Investments Value: £3.2m Contract: JCT 2005 Duration: 52 weeks The main scope of the project included the erection of a steel frame throughout the structure which connected to the existing building. This allowed the formation of a 5th floor extension to accommodate a new plant area plus the installation of 2 new lifts.
Other internal works included new feature wall in concrete repairs to existing beams, and Externally the building underwent a complete clean of the existing brickwork, the party wall facades were repaired and new skylights were installed to the basement area. |
|
|